Project Details Cheyney University Location – Cheyney, PA Project Scope Installed new water main Completed sewer and stormwater drainage systems Constructed new curb and...
Project Lowe’s Store – Lewes, Delaware Project Gallery Project Details Lowe's Store Lewes, Delaware Project Scope Asphalt Resurfacing ADA Bollard Cover & Sign Remove and Replace Concrete Curb Line Striping CMT Testing Work With Us We Are Ready...
Project Lowe’s Store – New Haven, CT Project Gallery Project Details Lowe's Store New Haven, Connecticut Project Scope Traffic Control Asphalt Milling Asphalt Paving Line Striping ADA Compliance Work With Us We Are Ready To Start Your Project ...
Project Home Depot – Locust Grove, GA Project Gallery Project Details Home Depot Distribution Center Locust Grove, Georgia Project Scope Traffic Control Asphalt Milling Asphalt Paving Line Striping ADA Compliance Work With Us We Are Ready To Start Your...
Project Scope – 4 in. Mill and Pave, Crack filling, Line Striped entire lot, Site Improvements
XPO Distribution
📍Newark, NJ
Project Scope – Full-depth asphalt removal and heavy-duty concrete replacement, including 10″ reinforced concrete pads and upgraded drainage swales. Completed with fresh line striping
Delaware
Amazon
📍Middletown, DE
Project Scope – 2.5″ mill and pave over 78,923 sq. yds., Removed and replaced 77 speed bumps, Removed and reinstalled existing wheel stops with rear pins, Line striped entire lot
Lowes
📍Lewes, DE
Project Scope – Asphalt Resurface, Removed and replaced curb, ADA bollard cover and sign, line striped entire lot
Georgia Projects
CarMax
📍Norcross, GA
Project Scope – 595,000 sq. ft. project, 2-inch mill and pave for the sales lot and a 4-inch mill and pave for the customer lot
Home Depot
📍Savannah, GA
Project Scope – 81,000 SQFT R&R Concrete Project: Removed 12″ of saturated soil and replaced subgrade, Installed 6″ perforated drainpipes draining to a retention pond, Reinforced subgrade with geogrid and 12″ of compacted stone
Cracker Barrell
📍Kennesaw, GA
Project Scope – Removed and disposed of existing sidewalk, Topdressed existing stone as required, Formed and poured new 4″ 4000 PSI Class A concrete with a broom finish
Amazon (IOS)
📍Stone Mountain, GA
Project Scope – Light-duty paving, concrete curbs, and heavy-duty concrete installed, Relocated and installed new light poles to improve visibility, Demolished concrete islands and installed ADA-compliant ramps to improve accessibility, Bollards added to protect pedestrian walkways and building perimeters, Reflective, water-based line striping applied
Home Depot Distribution
📍Locust Grove, GA
Project Scope – 6″ Mill and Pave using fibers for sustainability, Line striped entire lot
Home Depot Distribution
📍McDonough, GA
Project Scope – 5″ Mill and Pave using fibers for sustainability, Line striped where needed
Pennsylvania
Cheyney University
📍Cheyney, PA
Project Scope: Installed new water main, completed sewer and stormwater drainage systems, and constructed new curb and sidewalk
Self Storage
📍Huntingdon Valley, PA
Project Scope:2″ mill and pave over 7,994 Sq Yd, Installed 6.5′ x 6″ concrete-filled steel pipe bollard, Excavated trench up to 18″ deep, backfilled with stone and asphalt, and installed 4″ asphalt with hot tar edges
HOA Community
📍Phoenixville, PA
Project Scope:2″ Mill & Pave of Community Roadways and Parking Lot, Drain Inlet Replacements throughout community, ADA Repairs, Line Striping
Target Retail
📍Philadelphia, PA
Project Scope:2″ overlay on milled surface, Sidewalk replacement (5″), Curb installation (6″ standard & 4″ surmountable), ADA ramps (Type 1A), Decorative concrete bollards
Elco Highschool
📍Lancaster, PA
Project Scope: 2″ Mill and Pave, Installed new wheel stops, Line striped the entire lot and road
Walmart Distribution
📍Pottsville, PA
Project Scope: Excavated 9.5″ concrete + 6″ stone, Installed geogrid + 6″ crushed aggregate, Used concrete fiber reinforcement and concrete caulking, Heavy Duty Paving which included removing a 14″ section, installing geogrid, adding 7″ stone base + 5″ asphalt binder
Tennis Court
📍Harrisburg, PA
Project Scope: 2″ Pave, Applied acrylic resurfacer followed by multiple color coats, Line Striped court, Installed concrete curbs
Villanova (Cabrini) University
📍Radnor, PA
Project Scope: 2″ Mill and pave over 32,350 SY, Crackfilled 3,235 LF, Line striped entire lot and trail, 75 LF of curb replacement
New Jersey
XPO Distribution
📍Newark, NJ
Project Scope – 4″ Mill and Pave, 8″ heavy duty concrete replacement, Line striped entire facility and 24 new numbers at the bay doors
Complete Site-to-Striping Build
📍New Brunswick, NJ
Project Scope – Installed 3″ of binder and paved 2″, 8″ of concrete paving, installed a 4″ concrete sidewalk and curb, installed 8″ dumpster pads, Installed STOP signs and new bollards, Line striped entire lot
Project
📍Morrisville, NJ
Project Scope:
Lowes Retail
📍Robbinsville, NJ
Project Scope – Concrete Demolition
Office Building
📍West Windsor, NJ
Project Scope – Seal coated (2 layers) entire lot, Crack filled where necessary, Line striped
Lowes Retail
📍NJ
Project Scope – Performed 1.5″ Mill and Pave, Line stripped entire lot
Maryland
Estes
📍Baltimore, MD
Project Scope – Demolition & Site Preparation, Installed 15″ and 18″ reinforced concrete pipe (RCP), Temporarily removed and reinstalled chain link fence, Performed 2″ mill and pave of designated asphalt areas, Applied fresh line striping across the entire lot, Poured new concrete surfaces and installed new curbing, Supplied and installed new wheel stops throughout parking areas
Safeway (2 locations)
📍Gaithersburg, MD
Project Scope – 4″ Mill and Pave, ADA Compliance, Installed new bollards and signage, Removed and replaced concrete sidewalk, curb, and gutter, Line striped entire lot
Extended Stay America
📍Glen Burnie, MD
Project Scope – Two-Course Paving Repairs, 5″ Mill and Pave to areas needed, Applied two coats of sealer, Line striped entire lot
Lowe’s Store (Jackson) – 1.5″ Mill and Pave, Line Striped entire lot, CMT Testing
Governor’s Square Mall (Clarksville) – Mill & Paved 5 different areas at different specs., Full depth patching, Seal coated over 124,664 SY, Crack filled 12,000 LF, Line striped entire lot
New York Projects
Walmart (Cobblestone) – Pavement replacement that included 16” of pavement, 12” of new stone base, and a 3” binder topped with a 2” fiber-reinforced surface course. Replaced concrete and line stripped the entire lot
Lowes (Glenmont) – Resurfaced Existing Asphalt, Removed & Replaced Concrete Sidewalk, Line Striped entire lot, ADA Compliance